December 1, 2016, 9:00 am

Project Profile: David Whitney Building

davidwhitney

In recent years, there has been an effort in Detroit to restore the city’s historic downtown area. This rehabilitation included the David Whitney Building (David Whitney), which sat vacant for 15 years prior to its recent renovation. The mixed-use building now offers luxury residences, the Aloft Detroit at the David Whitney (Aloft), a restaurant and a bar.

A challenging, yet essential component of the David Whitney’s restoration, was selecting an HVAC system that could meet the 100-year-old building’s needs. The new system needed to serve the large space without disrupting any of its historic charm.

During the planning stages, developer Vince Dattilo, vice president of construction and project management, Roxbury Group, Detroit, and his team were concerned with the high cost and feasibility of running ductwork. Variable Refrigerant Flow (VRF) technology was appealing for its avoidance of this issue, as well as its impressive efficiency and reliability. Energy modeling supported VRF as the best option: Going with VRF would bring the original $6.8 million estimate for a forced-air system down to $5 million.

The project team selected VRF from Mitsubishi Electric. In addition to solving the need for low utility costs, Mitsubishi Electric’s indoor units’ clean design contributed to maintaining the building’s architectural integrity. Further, both guests and employees of Aloft appreciate the system’s high level of consistency and ability to provide personalized comfort in each individual room. Scott Mondock, Aloft’s director of engineering, called Mitsubishi Electric VRF “probably one of the best systems I’ve ever had a chance to work with.”

To learn more about how the David Whitney restoration has served as a catalyst for continued city of Detroit restoration, read the case study here.

Written by MitsubishiHVAC
Comments Off
Free Viagra Samples